Installation, commissioning and staff training are included in the Cryo X1 price in the contiguous US. Here is how we get from order to first guest, and how long each step takes.

Every Superhuman Cryo chamber is installed by our own technicians, not a subcontractor. Delivery, installation, commissioning and staff training are included in the price of the Cryo X1 in the contiguous US. Most sites go from order to first guest in 6–8 weeks.

1. Fit check

Before you order, we confirm the chamber fits your building. Send us:

  • A floor plan or photos of the room, with dimensions and ceiling height
  • The route from the delivery point to the room: doors, corridors, lifts, stairs
  • A photo of your electrical panel and its rating
  • Details of the room’s heating, ventilation and air conditioning

We come back with a yes, a yes with changes, or a different model that suits the space better. This is free and takes a few days. The general rules are on our room and power requirements page.

2. Site spec: electrical and HVAC

After you order, we send a site spec pack for your contractors.

Electrical

  • X1: dedicated 208–240 V or 400 V three-phase circuit

HVAC and ventilation

  • Electric chambers reject heat into the room. We give you the heat load so your HVAC contractor can size cooling or extraction.
  • Nitrogen cryosaunas need ventilation, a wall-mounted oxygen monitor and a safe storage area for the dewar.

Floor and finish

  • A level, solid floor. Walk-in chambers need the floor load confirmed.
  • Walls and flooring that tolerate occasional condensation near the door.

Your contractor completes this work before install day. We are available to answer their questions by phone or video.

3. Delivery and rigging

We schedule delivery once your site is ready. The X1 arrives crated and moves through standard commercial doorways. For any site with stairs or tight access, we plan rigging with you during a site survey.

4. Installation and commissioning

Our technicians position and assemble the unit, connect it to your supply and bring it down to temperature. Commissioning includes:

  • Full cold-run test at operating temperature
  • Checks of every safety system: inside door release, emergency stops, oxygen (and CO₂) monitoring, intercom and cameras
  • Controller setup: session presets, guest profiles and logging
  • Remote diagnostics connection on connected models
  • A signed commissioning report for your records

5. Staff training

Training happens on site, straight after commissioning, on your own chamber.

The Cryo X1 includes one full day of on-site training. It covers daily start-up and shutdown, guest screening, session protocols, cleaning, basic troubleshooting and emergency procedures. You also get written operating procedures. Train new staff later with a remote refresher.

6. Go-live

Most operators run a few staff and friends-and-family sessions before opening bookings. We stay in touch through your first weeks. Remote diagnostics lets our team see alarms and performance data on connected models. After that, your service and warranty cover takes over.

Typical timeline

Model Lead time from order Time on site
Cryo X1 (1-guest walk-in) 6–8 weeks 1–2 days

Lead times are typical, not guaranteed, and depend on stock and your site being ready. The most common cause of delay is the electrical supply, so book your electrician early.

Ready to check your space? Send your floor plan through the contact page. Leasing and loans are covered on our financing page.

Chambers for this

Recommended models

Walk-in · single guest

Superhuman Cryo X1

Whole-body cold, no nitrogen bill.

Guests
1
Cabin air
−110 °C
Cooling
Electric
Footprint
1.6 × 1.4 m
From$69,900or ≈ $1,450/mo
FAQ

Common questions

Is installation included in the price?

Yes. Delivery, installation, commissioning and staff training are included in the listed price within the contiguous US. Electrical and HVAC work on your side is done by your contractor to our spec.

How long does cryotherapy chamber installation take?

The Cryo X1 takes 1–2 days on site once the room and power are ready. Larger multi-guest chambers take longer.

What is the lead time from order to install?

Typically 6–8 weeks for the Cryo X1, depending on stock and your site being ready.

Do I need an electrician?

Yes, for the dedicated circuit. We send a written electrical spec your electrician can quote and install from before we arrive.

Talk to a cryo specialist

Get the price sheet and a fit check.

Tell us about your space and your guests. A specialist sends every price, the running-cost math for your volume and the room and power spec, usually within one business day.